Больше информации по резюме будет доступно после регистрации

Зарегистрироваться
Was yesterday at 21:38

Male, 35 years, born on 28 June 1990

Astana, willing to relocate, prepared for business trips

Civil structural engineer, Construction supervisor, Technical Supervision, Quality Control

Specializations:
  • Production engineer, quantity surveyor
  • Foreman, construction and installation manager

Employment type: full time, project work/one-time assignment

Work experience 16 years

February 2026currently
3 months
International Community Schools (Client-investor: Sheikh Muhammad Al-Shamma)

icsastana.kz/

Construction Project Coordinator
Project Management & Investor Representation - Representing and protecting the investor’s interests in interactions with project stakeholders and government authorities. - Coordinating collaboration between key project participants, including the General Designer, General Contractor, technical supervision, author supervision, suppliers, and other stakeholders. - Organizing and leading regular project coordination meetings. - Monitoring project schedule and construction budget. - Conducting project risk analysis and developing mitigation strategies. - Preparing and presenting regular analytical progress reports to the investor and senior management. 1. Pre-Construction / Design Stage - Managing the process of obtaining initial permits and approvals (land use agreement / lease agreement; technical specifications; regulatory approvals by state authorities). - Design Assignment / Preparing the Terms of Reference (TOR) for design development. - Coordinating design consultants and ensuring compliance with project timelines and quality standards for design and working documentation. - Managing the submission and approval process through state and non-state design expertise reviews. 2. Construction Stage - Coordinating activities of contractors, subcontractors, and design teams throughout the construction phase. - Monitoring compliance with the construction schedule and key project milestones. - Overseeing construction quality and ensuring compliance with approved design documentation. - Managing project budget and financial control, including verification of completed works certificates and cost monitoring. - Organizing regular project meetings and preparing management reports. - Identifying and mitigating project risks while resolving operational and technical issues. 3. Commissioning & Project Close-Out - Coordinating commissioning and start-up activities. - Managing the preparation of as-built and handover documentation. - Liaising with state construction supervision authorities to obtain compliance approvals. - Securing the permit for commissioning and operation of the facility. - Coordinating the handover of the completed project to the operating organization.
August 2025February 2026
7 months
JV Inkai LLP (Kazatomprom & Cameco)

inkai.kazatomprom.kz/ru

Lead construction engineer
- Approval and obtaining of permits and other documentation from local government bodies and state supervision bodies. - Formation and approval of contracts for design, construction and installation works (reconstruction, new construction, major/minor repairs). - Preparing of technical specifications for design and estimated documentation of major construction, reconstruction, and repair of buildings and structures. - Verification and analysis of the technical documentation of potential contractors as part of the competitive procedures. - Implementation of control and technical supervision over the design, construction and installation works. - Interaction with the bodies that carry out technical and design supervision. Participate in resolving issues related to changes in technical solutions in the design and other source documentation, which are aimed at reducing the cost and improving the technical and economic performance of construction and renovation projects. - Monitor the timely commissioning of completed facilities, organize the work of the commission for the acceptance (taking over) of completed construction/ repair works from contractors, and verify the compliance of the scope of work, deadlines, quality of completed works, and materials used, as well as the relevant executive and other technical documentation provided by the contractor during the execution of the work. - Monitor the quality of the elimination of shortcomings and defects by designer and construction contractors within the established deadlines. Correspondence with them in the framework of their fulfillment of their contractual obligations. - Determining the types and scope of work for subsequent preparation of cost documentation and developing initial technical documentation (defect lists and technical specifications).
January 2025August 2025
8 months

Astana

Construction, Real Estate, Architecture... Show more

Technical Supervision Engineer (Civil works)
- Control over compliance of the performed construction and installation works, applied construction materials, products, structures and equipment with the requirements of construction norms and rules, standards, technical specifications, approved design solutions and other normative documents; - To carry out inspection of concealed works and intermediate acceptance of critical structures with confirmation of the executed acts in the form established in the regulations; - Ensure control over timely elimination of discrepancies identified during acceptance of completed works; - Accept executive technical documentation from the construction organisation, check its completeness and quality of execution; - Control over the availability of the relevant right to the land plot, approved design documentation, positive conclusion of the expert examination of the construction organisation. Control over the existence of the relevant right to the land plot, approved design documentation, positive conclusion of the project expertise, as well as notification of the bodies exercising state architectural and construction control and supervision about the commencement of construction and installation works; - Control over the availability of a licence for the right to carry out the respective types of licensed architectural, town-planning and construction activities; - Exercise control over the correctness of storage, materials and equipment at the construction site; - Submit on a monthly basis to the state architectural and construction control department a report about the status and progress of construction;
February 2022January 2025
3 years
Novus Bolashak / Bolashak Atyrau. Project: 3GP, FGP, TCO

Atyrau, novus-bolashak.com/

Site Facilities Coordination Supervisor (construction of temporary buildings and maintenance)
- Quality control of construction and installation works performed by contractors during the construction of temporary buildings (modular buildings, hangars, tents) at 3GP areas for the mobilization of personnel during commissioning period. Quality control of materials used for construction, products, structures for compliance with project documentation and requirements of building codes and regulations, regulatory and technical documentation. - Preparation of permit documentation: ⸰ Permit to work (PTW) ⸰ Planning phase hazard analysis (PPHA) ⸰ Control and verification of the work safety analysis compiled by the WRP (work responsible person) (JSA). Monitoring compliance with the technology, the correct sequence during the execution of construction and installation works, as well as general monitoring of compliance with safety regulations by employees. - Preparation of applications, correspondence with interconnected departments for timely provision of special equipment (crane, mainlift, scaffolding, generators), materials and tools. - Maintenance of operated buildings. - Participation in the acceptance of works performed by subcontractors (PSSR).
December 2021February 2022
3 months
Eurasian Resources Group (ERG), Project: Construction of a plant for the production of special coal coke with a capacity of 400 thousand tons per year at the Shubarkol Komir field

Zhezkazgan, www.erg.kz/ru/enterprises/ao-shubarkol-komir

Technical Supervision Engineer
- Implementation of technical supervision at the facilities of the Eurasian Group, quality control of construction and installation works, applied materials, products, structures and equipment. - Control over the compliance of completed construction and installation works, applied building materials, products, structures and equipment with the requirements of building codes, standards, specifications, approved design solutions and other regulatory documents; - Control over the availability of the relevant right to the land plot, approved design (design and estimate) documentation, a positive conclusion of the examination of projects, as well as notification of the bodies carrying out state architectural and construction control and supervision on the start of construction and installation works; - Control over the availability of a license for the right to carry out the relevant types of licensed architectural, urban planning and construction activities; - Prepare and provide reports for GASK;
August 2020December 2021
1 year 5 months
"AK Altynalmas" JSC, Project: Construction of a gold recovery plant with a capacity of 5 million tons per year for processing gold-bearing ore from the Aksu deposit"

Stepnogorsk, www.altynalmas.kz/our-assets/aksu

Construction Engineer (Civil and Structural)
- Registration and preparation of the initial design permit documentation. - Technical support of the development of the design drawings for the project. - Review and acceptance of the construction part of the design drawings for the project, organization of approval of examinations. - Control over the design of the construction part and the execution of construction and installation works according to the approved schedules within the allocated funding. - Registration of initial permits for construction and installation works. - Technical supervision of the quality of construction and installation works performed by contractors, compliance of the performed works with the SNiP and the approved project, acceptance of works. - Organization of timely commissioning of objects and acceptance of the completed construction of the object by the state acceptance commission, or the working acceptance commission when it is fully ready in accordance with the approved schedule of works and tasks.
April 2020August 2020
5 months
"Komek" LLP (Сontracting company of KAZATOMPROM JSC), Project: Construction of a technological road to the Zhalpak field"

Sholakkorgan, www.kazatomprom.kz/ru/media/view/too_dp_ortalik

Road Construction Supervisor
- Organization of work production - Quality control of work - Maintenance of executive documentation at the facility - Planning, compliance with the work schedule - Production of construction and installation works in accordance with the project drawings and SNIP - Control of the consumption of construction materials, write-off of materials in the form of M29 - Issue of outfit tasks to foremens and brigades - Work with the Customer, with Technical supervision - Approval of changes in the project drawings with designer and Customer - Full control of the entire construction process from the start of work to commissioning and delivery to the Customer
January 2019April 2020
1 year 4 months
BI Group, Project: "Lake Town" (Construction of a residential complex)

Almaty, bi.group/ru

Construction Supervisor (Civil and Structural)
- Organization of construction and installation works in accordance with design documentation, Construction Norms and Regulations, technical specifications and other regulatory documents. - Ensuring compliance with the technological sequence of construction and installation works on the site. - Drawing up an application for construction machinery, materials, structures, parts, tools, equipment and ensuring their effective use. - Accounting of completed work, preparation of technical documentation. - Maintaining executive documentation (work production logs, input control logs). - Participation in the acceptance of work performed by subcontracting organizations.
March 2018January 2019
11 months
BI Group, "КAZPACO" LLP, Project: BMEI, FGP, TCO

Atyrau, company.bi.group/en/project/show/67

Site Civil Engineer
- Responsible for technical supervision of construction and installation works. - Verification of the scope of compliance of construction works, approved structures of estimate documentation, working drawings, construction norms and rules, standards, technical conditions, labor standards. - Constant review and coordination of issues arising from changes in decisions on construction and design, operational issues on the replacement, if necessary, materials, products and structures. - Research and consideration of causes of failures and deterioration of construction and installation conditions. - Implementation of technical acceptance of construction and installation works and facilities, preparation of necessary technical documentation. Participation in the work of commissions for acceptance of construction objects and their commissioning. - Preparation of estimate documentation for additional work (mechanical, painting, insulation and construction) - Inspection and maintenance of established reporting on the project activities of the customer. - Request from the structural subdivisions of the client’s information and documents necessary for the performance of design work.
November 2016March 2018
1 year 5 months
BI Group, "KAZPACO" LLP, Project: CaTRo, FGP, TCO

Atyrau, tengizchevroil.com/projects

Field Data Measurement Engineer (Cost controller, Quantity surveyor)
- Daily collection of information, control of fixed and variable production costs. - Calculation of the cost of work, costing. - Preparation of planned expenses (budget). - Preparation of daily, weekly, monthly reports, comparison and analysis of planned / actual costs - Work with design and estimate documentation, with contracts, agreements. - Manage the tracking of costs for all reimbursable work – Ours with the client and work by our subs or vendors. Prepare invoices to the client for charges to the contract. Review & evaluate the financial portion of charge requests from Subcontractors. - Work with our quantity surveyors to evaluate and obtain site approvals of invoices from all construction subcontractors. - Tracking the performance of work on non-contracted additional work. - Preparation of Interim Payment Application (IPA), verification of certificates, works and all enclosed documents before monthly sending to the Client - Preparation of Form 2B: Acceptance of Completed Acts, Certificate of the Value of Work Done and Costs incurred KC3, Kazakhstan Content (KC) Reporting Form. Prepare monthly and weekly cost reports in a table or chart for each location within the CaTRo and BMEI project
June 2015November 2016
1 year 6 months
BI Group, Project: Reconstruction of the highways Astana-Pavlodar and Astana-Petropavlovsk
Road Construction Technical Engineer
- Preparation of initial data for the development of a project for the production of works, line and network schedules for the production of works. - The introduction of supervision of the implementation of construction works by contractors. - Verification of compliance with the volume of construction and installation works. - Execution and acceptance of technical and executive documentation.
May 2013June 2015
2 years 2 months
BI Group, Project: “Arman kala” (Construction of a residential complex)

Astana

Construction Foreman/ Supervisor (Civil and Structural)
- Ensuring the implementation of the construction and installation work plan on the site in accordance with the drawings, the design of the work, the production plan and regulatory documents. - Compliance with work schedules - Organization of operational accounting of the implementation of production tasks and the receipt of building materials, structures, products. - Management of the site workers. - Monitoring the observance by workers of safety precautions when performing technological operations for the construction work.
May 2010April 2013
3 years
“Bogatyr Komyr” LLP

Ekibastuz, www.bogatyr.kz/

Railway Construction Foreman/ Supervisor
- Organization of maintenance in constant serviceability of all elements of the railway track: subgrade, artificial structures, track superstructure, level crossings, track arrangements and allotment strip in accordance with established standards, ensuring the safety and continuity of train traffic; - Participated in capital construction, average railway repair ways; (on station tracks and turnouts; on distillation tracks)

Skills

Skill proficiency levels
Construction Management
Cost Control
Cost Accounting
Estimates
Project Documentation
design drawings
Production Planning
Budgeting
Performing technical supervision
Quality Control
Commissioning
Regulatory and technical documentation
AutoCAD
MS Excel
MS Word
MS Project
SAP ERP
Project Wise (Bentley Systems)

About me

Responsible, sociable, executive, hardworking, resistant to stressful situations. Inquisitive and easy to teach, not conflicted, able to work in a team and individually.

Higher education

2013
Higher education
Ekibastuz technical and engineering institute named after the academician K.Satpayev
Construction, Industrial and Civil Engineering, Civil engineer

Languages

Kazakh — Native

English — B1 — Intermediate

Russian — C2 — Proficiency

Professional development, courses

2021
Expert's certificate 1 level for the right to conduct technical supervision in terms of load-bearing and enclosing structures / Accreditation number: № KZ18VJE00066415
State institution "Office of State Architectural and Construction Control of Almaty region"

Citizenship, travel time to work

Citizenship: Kazakhstan

Permission to work: Kazakhstan

Desired travel time to work: Doesn't matter