Больше информации по резюме будет доступно после регистрации

Зарегистрироваться
Was yesterday at 13:02

Male, 38 years, born on 20 May 1987

Almaty, willing to relocate (Astana, Karaganda, Shymkent), prepared for business trips

Project manager, Chief Engineer, Operational Director, Technical Director.

Specializations:
  • Head of production

Employment type: full time

Work experience 17 years

March 2022September 2025
3 years 7 months
LLP "ARXMINERALS"

www.arxminerals.kz/

Director of Quality control dpt.
- Strategic (LOMP) and operational planning for open-pit mining operations, as well as hydrometallurgical complex operations; - Operational control of the drilling and blasting processes, extraction of ore; - Control of losses and ore dilution during development of production blocks; - Management of the process of preparing ore for leaching (crushing/screening/stacking/calculation of technological parameters of copper leaching processes) in accordance with established parameters; - Implementation of control over the ore leaching process (irrigation density, specific rate of sulfuric acid) in accordance with the production plan. - Implementation of control over the main process parameters (extraction and re-extraction, electrolysis) of the process of processing heap leaching solutions using SX-EW technology; - Analysis of the effectiveness of the ore preparation process for leaching, assessment of the efficiency of the approved parameters of the ore leaching process and processing of heap leaching solutions using the SX-EW method; - Adjustment and modification of process parameters for ore preparation processes for leaching, ore leaching, and processing of heap leaching solutions using the SX-EW method, in order to improve process technologies; - Creation and development of a methodological base for a chemical analytical laboratory to ensure control of technological processes, the quality of chemical reagents and finished products; - Participation in research (selection of extractants, solvents, adsorbents, etc.) and developments aimed at improving technological processes for ore leaching and processing heap leaching solutions using the SX-EW method; - Providing production personnel with safe working conditions, monitoring compliance with labor and production discipline, and internal work regulations. Implemented measures to improve production processes: - Commissioning of the extraction and electrolysis workshop, bringing production to its design capacity; - Selection of the optimal granulometric composition of crushed copper ore to intensify the copper leaching process; - Increasing the efficiency of the stage of aqueous washing of the organic phase and renewal of electrolytes from impurities, by introducing changes to the design solutions of the extraction and electrolysis shop of the BERKARA Mine; - Analysis and selection of a new type of extractant to reduce the formation of cradle cap and loss of the organic phase during extraction and re-extraction.
September 2017May 2022
4 years 9 months
"Baiken-U" LLP

Kyzylorda, baiken-u.kazatomprom.kz

Mining Industry... Show more

Chief engineer of site KHARASAN-2
From technical point: Organization and control of executing production objectives of company in the following areas: * Preparation of technologycal blocks to operation (Drilling of wells, assembling of technologycal units etc.) according mining plan. * Operation of technologycal blocks (accidification, extraction, maintenance to support fail-operational exploitation etc.). * Processing of production solution ( sorption, desorption processes) to obtain uranium eluate. * Processing of uranium eluate (precipitation, filtration, drying and calcination processes) to obtain final product uranium oxide U3O8. * Compilation of schedule of preventive works to support of technological equipments in working order. * Control accomplishments of Health Environment and Safety system requirements. * Control accomplishments of law requirements in industrial, radiation, environmental safety. * Coordination of interaction between subdivisions of mine. * Control of fulfilment of covenant commitments by contractors. Obligations in financial part of work: - Preparation of budget taking in account all the necessary resourses for implementation of the production program, including: * Expenses for mining and geological exploration works, * CAPEX ( by all the subdivisions.). * OPEX ( by all the subdivisions.).
February 2017September 2017
8 months
KATKO JV LLP

Kazakhstan

Head of production optimization group
- Organization of works for optimization of production processes in uranium mining by ISL method; - Identification and implementation of appropriate working regimes for technological blocks taking into account their geological and hydrogeological peculiarities; - Development of KPI (key performance indicators) for main production indicators of ISL process; - Analysis of KPI results in case of deviation from set parameters, using the results of following complex works: * 3D models of technological blocks; * Hydrodynamic simulations; * Specific simulations made by specialists of AREVA MINES; - Management of "LOGIMINE" database. Control over relevance of data input into the base; - Coordination of contracting organizations involved in production programs; Obligations in financial part of work: - Preparation of budget for required materials and equipment for implementation of the production program; - Control over contract duties of contracting organizations involved in implementation of production programs. Identification of economic profitability of fulfilled activities. Obligations in HR management: - Staff recruitment and placement, reasonable distribution of labor force; - Strict control over quality implementation of tasks given to the employees of ISR group; - Evaluation of NON-M&P performance; - Preparation of individual development plan for each employee of NON-M&P category;
August 2013February 2017
3 years 7 months
KATKO LLP JV AREVA & KAZATOMPROM

Kazakhstan

Head of ISR group
From technical point: - Organization of works for implementation of uranium mining program in accordance with the In-Situ Leaching technology and Mining operations development plan; - Organization and control of extraction process on the site South Tortkuduk South (Pilot Plant). - Analysis of geological and geotechnological results of Pilot Plant for definition of main production figures; - Preparation of measures and plans for non-emergency operation of the extraction site, improvement of occupational safety, environment protection and radiation protection state, reinforcement of working and production discipline; - Assessment of risks in all types of activities carried out during exploitation of geotechnological well field. Identification of significant risks by results of the assessment, as well as preparation of "Action plan in the sphere of OHS" aimed to mitigate the risks. - Preparation of ТРМ (Total preventive maintenance) plan for total maintenance of the equipment; - Preparation of plans for work over operations in technological wells; - Implementation of technical training for personnel of extraction site related to exploitation of geotechnological well field and in-situ leaching technology; - Development of KPI (key performance indicators) for main production indicators; - Coordination of contracting organizations involved in production programs; Obligations in financial part of work: - Preparation of budget for required materials and equipment for implementation of the production program; - Keeping records of receipt and expenditure of material assets and preparation of limit passbook (material report); Obligations in HR management: - Staff recruitment and placement, reasonable distribution of labor force; - Strict control over quality implementation of tasks given to the employees of ISR group; - Evaluation of NON-M&P performance; - Preparation of individual development plan for each employee of NON-M&P category;
March 2013August 2013
6 months
APPAK JV LLP KAZATOMPROM & SUMITOMO Corp

Kazakhstan, www.appak.kazatomprom.kz

Process engineer of ISR department
- Control of well field exploration (infrastructure, equipment equipment). - Management of ISR dpt employees (ISR foreman, RVR (repair-and-renewal works) foreman, ISR operators, electrician, mechanician). - Control of conformity of extraction process according to mining procedure rules. - Feasible arrange of equipment and equipment all around of site. - Coordination of ISR activities with another departments. - Controlling the implementation of safety rules by employees under my supervision. - Development of safety instructions for ISR employees.
August 2011March 2013
1 year 8 months
"Stepnoe-RU" Affiliate of KAZATOMPROM

Kazakhstan, www.sauran.kazatomprom.kz

Engineer geotechnologist
- Preparation of mining plan. - Planning of drilling works and quality control of drilling and construction works - Interpretation of geological data. - Sketching of geological cross sections. - Control of extraction process. - Analysis of geotechnological parameters of exploration blocks.
November 2009August 2011
1 year 10 months
"Stepnoe-RU" Affiliate of KAZATOMPROM

Kazakhstan, www.sauran.kazatomprom.kz

ISR operator
- Control of in situ leaching process on technological blocks. - Control of condition of infrastructures and equipment. - Control of acid supply (sulfuric acid) during the acidification and extraction process. - To keep the balance between PR and VR solutions in the blocks. - To take PR samples for identification of chemical components. - Data collection of main technological parameters (volume of PR, VR, Acid, pressure. etc.)
January 2009November 2009
11 months
"Stepnoe-RU" Affiliate of KAZATOMPROM

Kazakhstan, www.sauran.kazatomprom.kz

Mine surveyor
- Projecting of technological schemes of main infrastructures (mainly and secondarily pipelines, acid lines, electrical lines etc.). - Planning of location places of exploration and technological wells. - Mathematical computation of coordinate. - Transfer of coordinate from project to the ground - Cameral treatment of results of topographic surveying.
October 2008January 2009
4 months
"Stepnoe-RU" Affiliate of KAZATOMPROM

Kazakhstan, www.sauran.kazatomprom.kz

Worker (on mine surveying)
Laying, matching, topographic surveying of main infrastructure during implementation of mining works.

Skills

Skill proficiency levels
Production Planning
Health & Safety
Team management
Risks assessment
Forming Budget
MS PowerPoint
MapInfo Professional
AutoCAD
ArcGIS
SAP
MS Office
MS Outlook

Driving experience

Driver's license category B, C

Higher education (master)

2022
Higher education (master)
SWISS BUSINESS SCHOOL
International Management, Master of business administration
2018
Higher education (master)
Tomsk Polytechnical University
Engineering school of Nuclear technology, Uranium production and processing technology
2011
Higher education (master)
Mining institute named after Baikonurov O, Mining engineering (Master of mining engineering and technology)
2008
Higher education (master)
Mining institute named after Baikonurov O, Geodesy and cartography (Bachelor of geodesy and cartography))

Languages

Kazakh — Native

English — B1 — Intermediate

Russian — C2 — Proficiency

Professional development, courses

2018
"Implementation of Lean Production - Modern Experience of Japan" Venue - Tokyo/Kyoto/Nagoya
SAG Management Ltd, UK/London, Performance
2018
Implementation of KPI at enterprise
The Astana school of business and technology, Performance
2017
A3 - Methodology for solving problem
Coach Emmanuelle CHIROL - Operational & Project Department of AREVA, Performance
2017
"Development, implementation and documentation ISO 14001:2015, OHSAS 18001:2007".
LLP "SGS KAZAKHSTAN LTD", Integrated system of management
2016
Finance for NON-Financial Managers
EY Academy of Business, Finance
2016
Managerial skills
Ambition company (www.ambition.uk.com), Management
2016
Uranium geology
Kazakh nuclear university, Geology
2015
Relationship with employees within frame of labor code
N Gileva - candidate of science of low, associate professor of Kazakh National University, Staff managment
2014
Leadersheap in safety
Abiroy Technical Training, HSE
2014
Lean basic
"Lean consult" consalting group, Performance
2013
8D Methodology for solving problem
"Lean consult" consalting group, Performance
2013
Work assessment and development of employees of M&P and NON M&P categories
HR department, KATKO JV LLP, Staff managment
2012
"Summer scholl-2012 - New knowlage and managerial skills for improvement of operational activity "
Kazakh nuclear university

Citizenship, travel time to work

Citizenship: Kazakhstan

Permission to work: Kazakhstan

Desired travel time to work: Doesn't matter