Больше информации по резюме будет доступно после регистрации

Зарегистрироваться
Was less than a week ago

Male, 38 years, born on 15 August 1987

Astana, willing to relocate, prepared for business trips

Construction manager, Project manager, Fit-out manager

Specializations:
  • Chief project engineer
  • Construction project manager

Employment type: full time

Work experience 12 years 5 months

January 2026currently
4 months

Industrial Equipment, Machine Tools and Components... Show more

Service Manager
Managing field service operations and maintenance activities. Supervising service technicians and organizing work schedules. Ensuring equipment reliability, safety compliance, and service quality. Coordinating corrective and preventive maintenance. Handling customer issues and ensuring timely resolution. Monitoring KPIs, service performance, and operational efficiency. Ensuring compliance with safety standards and company procedures.
January 2022August 2024
2 years 8 months
Aldar EuroAsia Abu Dhabi Plaza Nur-Sultan

Astana

Senior Fit-out Engineer
Lead and manage multiple fit-out projects from initiation to completion, ensuring timely delivery within budget. Develop detailed project plans, schedules, and budgets, monitoring progress and adjusting plans as needed. Oversee procurement of materials, equipment, and subcontractors, negotiating contracts and ensuring cost-effectiveness. Conduct regular site inspections to monitor quality, safety, and progress, resolving any issues that arise. Coordinate with architects, designers, clients, and other stakeholders to ensure project requirements are met. Prepare and present project reports, including progress updates, financial status, and risk assessments. Coordinated with suppliers, subcontractors, and other project stakeholders to ensure smooth project flow. Provided technical support and problem-solving expertise to the project team. Safe and secure works during fit-out (0 incidents). Competence in conflict and crisis management.
January 2020December 2021
2 years
Aldar EuroAsia Abu Dhabi Plaza Nur-Sultan

Astana

Facility Maintenance Engineer (Building Fabric)
Manage and coordinate planned preventative maintenance of building fabric volume as per PPM plan. Prepare assessment and recommendation report for landlord Civil and Architectural changes. Coordinate with consultant and contractor all potential modifications. Manage and coordinate DLP procedures between all parties. Preparation of tender document, procurement and execution of landlord modification work. Manage and implement all inventory, storage, related to MEP and building fabric. Manage and coordinate with landlord contractor all site conditions to keep in shape as new. Manage and implement key management system. Technical acceptance of completed construction and installation works of real estate objects and fixed assets with execution of all necessary technical documentation. Preparation of technically grounded expert opinions on non-compliance with international or national standards of equipment and knowledge elements with a detailed description and proposals for the most safe and urgent elimination. Preparation of reports on its activities and suggestions for improvement that are accurate, complete, reliable,and meet the requirements of customers and management. Assessment of infrastructure conditions, operational audit, technical certification. (by building elements) Manage all work related to all civil work with state authorities, controling and resource supplying organisations on issues related to construction and repair works.
January 2019December 2021
3 years
Arabtec Consolidated Contractors Ltd Abu Dhabi Plaza project

Astana

Construction, Real Estate, Architecture... Show more

Senior Mechanical Engineer
Knowledge of MEP Works: Air Conditioning System Plumbing and Drainage System Fire Fighting System Duties & Responsibilities: • Check the MEP Installation Works, whether the works are been executed as per the approved shop drawings and approved material. • Check all delivered materials at site to comply with contract specification. • Issuing of method statement and conducting tool box talk before starting of any new activities at site. • Collecting the Documents and reports related to NCR, SON to close out it. And Raising the WIR, MIR to get the approval from the consultant. • Find out the deficiencies of work on site at the time of execution, then report to the Site Engineers and raising the Site Instructions to the respective Site Engineers and Managers. • Arranging of material inspection at site and get approval from the consultant. • Raising the inspections for installations of all MEP works executed on site and get approval from the consultant. • Checking of the MEP services Provisions & Locations as per the approved shop drawing before the concreting works. • Manpower’s coordinations.
October 2017December 2018
1 year 3 months
Arabtec Consolidated Contractors ltd. Abu Dhabi Plaza Astana

Astana

Construction, Real Estate, Architecture... Show more

Technical coordinator MEP
• Submition/Resubmition RFIT. • Prepare closeout reports regarding NCR, SOR. • Reviewing Engineering drawings for comments filing. • Prepare transmittal for consultant and Engineers’s office • Assist Departmental Manager for all Engineering and Desigen Cordination related activities. • Preparing weekly and monthly reports. • BIM/ CAD Engineers coordination • Assisit Russian/Kazakh into English translation • Engineering drawings coordination to DCG Group and Site Engineers. • Preparing identification labels for MEP systems.
January 2017September 2017
9 months
Logic Services Kazakhstan Abu Dhabi Plaza Project, Astana/Kazakhstan
MEP Site Coordinator
Responsibilities: * Obtain all necessary work permits and approvals prior to start to work. ; * Tool-box talk with personal ; * Arrange organize and control of manpower for MEP installation works ; * Material order request and delivery of materials to the site, preparing take-off ; * Preparing weekly progress report regarding installed mechanical and electrical systems ; * Preparing RFIT for internal inspection contractor QA/QC ; * Attending safety site walk
October 2016January 2017
4 months
World Monitoring Abu Dhabi Plaza Progect, Astana/Kazakhstan
Ducting Chargehand
- preparing requisition for ducting fabrication workshop - organize and preparing ducting erection work - preparing ducting test work - preparing identification labels for MEP systems
August 2016January 2017
6 months

Business Services... Show more

Ductman
ducting erection works ducting insullation works
January 2014January 2016
2 years 1 month
Otan Global Group
Construction Supervisor
• Organization and control of the work of installers (aluminum structures, finishers, automatic gates, barriers, protective roller blinds, all-glass partitions) • Budgeting • Interaction with suppliers of building materials • Full supervision of the project prior to commissioning
February 2012December 2013
1 year 11 months
Baidar Ltd
Installation Foreman
Supervise aluminum partition installers team

Skills

Skill proficiency levels
Advanced level
Деловая переписка
Организаторские навыки
Сопровождение строительства
Level not specified
Easy trainability,
Interpersonal skills
Working under stress
Project management
Time management
Organization Skills
Public Speaking
Problem solving
Decision making
Teamplayer
Business communication
MS PowerPoint
Проектная документация
Английский язык
Управление производством
Контроль качества
Teamleading

Driving experience

Driver's license category B

About me

While working in Abu Dhabi Plaza MFC, as a Senior Fit-out Engineer, projects of about 15,000 sq/m in Food & Beverage, Retails, Class A offices including modification of offices were implemented. (Le-toile, Dyson, Cafe Mary, Twinset, Patrizia PEPE, Pinko, Finn Flare, Top studio, Bla Bla Bar, Technodom, Qaz Golder, Josiny, GMC offices, Linear Offices, QazAutoZhol Offices)

Higher education

2011
Higher education
West-Kazakhstan agrarian technical university named after Zhangir Khan
Civil engineering, Civil engineer

Languages

Kazakh — Native

English — C2 — Proficiency

Russian — C2 — Proficiency

Citizenship, travel time to work

Citizenship: Kazakhstan

Permission to work: Kazakhstan

Desired travel time to work: Doesn't matter