Больше информации по резюме будет доступно после регистрации
ЗарегистрироватьсяWas 23 minutes ago
Male, 37 years, born on 5 March 1989
Astana, willing to relocate, prepared for business trips
Engineer
1 300 000 ₸ in hand
Specializations:
- Other
Employment type: full time, part time, project work/one-time assignment
Work experience 15 years 3 months
May 2024 — currently
2 years
Penoplex
Technical Specialist for the Northern Region
- Technical support of construction projects in the northern region of Kazakhstan: Astana, Karaganda, Pavlodar, Kokshetau, Petropavlovsk, Zhezkazgan.
- Participation in the work of the company’s technical department, specializing in solutions based on PENOPLEX products.
- Execution of thermal engineering calculations and material quantity estimates for various structural systems (foundations, roofs, walls, etc.) using XPS and PVC membrane technologies.
- Collaboration with design institutes and engineering companies: provision of technical nodes, solution albums, and recommendations; adaptation of details to specific project requirements.
- Supervision of installation works (field technical support), including site visits and author’s supervision.
- Acceptance of completed construction projects implemented with PENOPLEX system solutions.
- Accreditation of contracting organizations in accordance with company requirements.
- Technical consulting for clients, designers, contractors, and distributors; participation in business meetings and negotiations as a technical expert.
- Strong knowledge of XPS and PVC membrane production technologies, as well as the full range of system accessories for complex structural solutions.
- Compliance with corporate standards in occupational safety, health, fire protection, and quality control.
June 2022 — March 2024
1 year 10 months
Atyrau
Construction, Real Estate, Architecture... Show more
CAD-draftsman (TCO position)
- Reviewed project documentation for compliance with regulatory and technical requirements, GOST standards, and TCO corporate specifications.
- Verified project documentation against actual site conditions (as-built verification).
- Accepted and controlled design documentation for construction and commissioning works submitted by contractors.
- Developed and issued as-built drawings across all engineering disciplines, with a focus on instrumentation and electrical systems.
- Monitored the status of Technical Queries (TQs) and Requests for Information (RFIs) on site, ensuring timely updates to related documentation.
- Collaborated closely with engineers from other disciplines to coordinate design solutions.
- Assisted HSE inspectors in developing evacuation plans for the “Orken Village” camp facilities.
- Maintained professional correspondence with project management, procurement, quality control departments, discipline engineers, and business partners.
- Prepared weekly summary reports and analytical documents.
- Ensured strict compliance with TCO’s health, safety, fire protection, and internal labor policies.
July 2017 — June 2022
5 years
Atyrau
PSI Designer (TCO position)
- Development of design documentation and drawings in accordance with A-ST-2004 standard.
- Updating as-built drawings across all disciplines based on construction documentation, in compliance with A-ST-5013 and A-ST-5026 standards.
- Control of updates and revisions to project and as-built documentation within the scope of ongoing work (MOC – Management of Change).
- Monitoring compliance with TCO corporate design standards and requirements.
- Collaboration with engineers from related disciplines (instrumentation, electrical, mechanical, etc.) to coordinate technical solutions.
- Site visits to verify and clarify project information directly on location.
- Participation in planning and execution of tasks within the department, including urgent assignments as the project progresses.
- Execution of assignments and instructions from the direct supervisor.
- Contribution to the development of internal e-learning portals and professional communities within TCO and Wood.
- Compliance with and support of the company’s occupational safety, health, environmental protection, and socio-environmental responsibility policies.
December 2014 — July 2017
2 years 8 months
Atyrau, www.fluor.com
Construction, Real Estate, Architecture... Show more
PSI Designer (TCO position)
PSI - Process Safety Information.
October 2012 — June 2014
1 year 9 months
Karaganda
Industrial Equipment, Machine Tools and Components... Show more
Design engineer
- Design, implementation, and support of automation systems for oil and gas facilities.
- Development of the “Well Cluster Telemechanics System (AGZU)” for ZhaiykMunaiGas and KainarMunaiGas Oil Production Directorates. The system enables remote monitoring and control of Group Metering Units (GMU), with data transmission via radio channel using Radio Ethernet technology and visualization through a SCADA interface.
- Author’s supervision throughout the project lifecycle; participation in the installation of instrumentation (temperature sensors by Emerson, pressure transmitters by Endress+Hauser, limit switches, and other equipment).
- Signal integration (analog and digital) from field devices to the control cabinet with a TREI controller.
- Wireless data transmission to the operator workstation (HMI) using Canopy communication equipment.
- Commissioning of the entire system—from sensor installation to data visualization on the operator's screen.
- Preparation and execution of acceptance documents; coordination and approval with the technical personnel of the client.
- Successful completion of state project documentation expertise.
- Preparation and submission of full as-built documentation to the head office of the client, Embamunaigas JSC.
December 2010 — October 2012
1 year 11 months
Atyrau
Electronics, Tool Engineering, Household Appliances, Computers and Office Equipment... Show more
Design engineer
- Electrical system design for the “TCO Plant Overhaul 2012” project using Schneider Electric equipment.
- Fire detection system design for the “TCO Plant Overhaul 2012” project based on Siemens equipment.
- Design of telecommunications and telephony systems for the “TCO Plant Overhaul 2012” project using Cisco hardware.
- Fire detection system design for the TCO Drilling Base (Siemens-based).
- Updates and modifications of fire detection system drawings for all warehouses of the TCO Industrial Base.
- Revisions to gas detection system documentation for TCO boiler facilities.
- Preparation of as-built documentation packages for fire detection systems at the TCO Industrial Base and TCO Village in compliance with GOST standards and TCO corporate requirements, for submission to the TCO archive.
- Development of a mitigation project to eliminate unintended diesel engine startups in backup fire pumps at the TCO plant (based on Kim Hot Start systems for Caterpillar engines).
- Design of a gas detection system for the Wastewater Treatment Facilities using Dräger equipment.
- Successful completion of Ministry of Emergency Situations (MES) fire safety expertise and commissioning of fire detection systems.
Skills and Competencies:
* Electrical and instrumentation/control system design.
* Strong command of Kazakhstan’s technical regulations (SNiP, GOST, VNIR) and TCO internal standards.
* Experience with construction procedures, project documentation, and quality control protocols.
* Development of electrical, instrumentation, and structural drawings, equipment layout plans, and technical manuals.
* Preparation of progress reports and technical documentation.
* Collaboration with site supervisors and installation teams for efficient project execution.
* Execution of assigned tasks from management and participation in work planning.
* Maintenance of complete technical records in compliance with TCO and national requirements.
* Full participation in all design stages, including data collection, drawing development, preparation of explanatory notes, and compilation of final documentation packages for archiving.
August 2010 — December 2010
5 months
Karaganda Plant of Electrical equipment
Karaganda
Structural engineer
- Study of relevant technical literature in mechanical engineering and energy systems.
- Development of single-line diagrams, schematic drawings, and installation plans for a wind turbine prototype.
- Participation in equipment installation and commissioning.
- Collection of operational data and maintenance of a performance logbook.
- Analysis of collected data and market research for potential distribution.
- Preparation of a profitability report evaluating the feasibility of mass production of the wind turbine at the plant.
Skills
Skill proficiency levels
Driving experience
Own car
Driver's license category BAbout me
Windows
Internet
Microsoft Office (a full pack)
Corel Draw
AutoCad
Compas
АВС-4
Autodesk Revit
Microstation
Sociable, ability to work in team. Responsible. Discipline. Accurate. Self-dependent. Goal-oriented. Ability to learn, memorize and grasp new assignments promptly as well as take
own decisions, if required.
Higher education
2021
Higher education
Karaganda Technical University
Faculty of power Engineering, Automation and Telecommunications, Master of Science in Engineering. Electric Power Engineering
2012
Higher education
University “Bolashak”
Economic and Information technology faculty, Economic
2010
Higher education
Karaganda state technical university
Architectural and civil faculty, Fabrication of construction materials, items and structures
Languages
Professional development, courses
2025
Qualification Certificate: Chief Project Engineer
LLP "Kailas Group", In the staff of a design/construction organization
2010
Cost estimating program АВС-4
Training centre «VIP»
Citizenship, travel time to work
Citizenship: Kazakhstan
Permission to work: Kazakhstan
Desired travel time to work: Doesn't matter