Больше информации по резюме будет доступно после регистрации

Зарегистрироваться
Was less than a week ago

Male, 29 years, born on 25 June 1996

Astana, not willing to relocate, prepared for business trips

Field Engineer, Site Manager, Project Manager, Chief Project Engineer

Specializations:
  • Chief project engineer
  • Electronics engineer
  • Power engineer, electrical engineer
  • Foreman, construction and installation manager
  • Construction project manager

Employment type: full time

Work experience 7 years 9 months

January 2023currently
3 years 4 months
Tumar Group

Astana

The head of the site
- construction control, - control of earthworks, - control of concrete works, - control over the arrangement of reinforced concrete structures, - control of waterproofing of reinforced concrete structures. - coordination of subcontractors, - lifting work. - installation of insulating cuffs at the joints of pipelines. - laying of power and high-voltage cable lines. -installation of power and substation equipment - installation of lighting and automation networks.
November 2021September 2022
11 months

Astana

foreman
- construction control, - control of earthworks, - control of concrete works, - control over the arrangement of reinforced concrete structures, - control of waterproofing of reinforced concrete structures. - coordination of subcontractors, - lifting work. - installation of insulating cuffs at the joints of pipelines. - laying of power and high-voltage cable lines. -installation of power and substation equipment - installation of lighting and automation networks.
March 2018August 2021
3 years 6 months
BI-Group, ТМ

Astana, www.bi-group.kz

Construction, Real Estate, Architecture... Show more

foreman
- construction control, - control of earthworks, - control of concrete works, - control over the arrangement of reinforced concrete structures, - control of waterproofing of reinforced concrete structures. - coordination of subcontractors, - lifting work. - installation of insulating cuffs at the joints of pipelines. - laying of power and high-voltage cable lines. -installation of power and substation equipment - installation of lighting and automation networks.

Skills

Skill proficiency levels
MS Office
MS Outlook
AutoCAD
Team management
Business communication
Project management
Negotiation skills
Career Development
Development
Personnel management
Teamplayer

About me

lead a healthy lifestyle, discipline and punctuality, result-oriented, analytical mindset, a penchant for technical thinking, attention to details, ability to make quick and accurate decisions in emergency, desire for professional growth, teamwork.

Higher education (master)

2020
Higher education (master)
механика-математический факультет, Механика
2018
Higher education (master)
Строительство, Евразийский национальный университет имени Л.Н.Гумилева
Архитектурно-строительный факультет, Проектирование зданий

Languages

Kazakh — Native

English — B2 — Upper Intermediate

Russian — C1 — Advanced

Citizenship, travel time to work

Citizenship: Kazakhstan

Permission to work: Kazakhstan

Desired travel time to work: Doesn't matter