Больше информации по резюме будет доступно после регистрации

Зарегистрироваться
Was today at 09:05

Male, 46 years, born on 22 May 1979

Astana, willing to relocate, prepared for occasional business trips

Project manager

Specializations:
  • Construction project manager

Employment type: full time

Work experience 22 years 11 months

May 2023October 2025
2 years 6 months

Kostanay

Automotive Business... Show more

Project manager "Development of KIA plant project in Kostanay city, Kazakhstan"
Managing design and construction of KIA plant in Kostanay city, Kazakhstan, including: Develop comprehensive project plans, including timelines, resource allocations and procurement strategies. Coordinate and oversee construction activities, ensuring adherence to project schedules and specifications. Evaluate and select contractors and subcontractors based on qualifications, experience and cost-effectiveness. Monitor project progress, track key performance indicators (KPIs) and report on project status to stakeholders. Ensure compliance with safety regulations and legal requirements, prioritising a safe working environment for all involved. Manage construction project documentation, including contracts, permits, drawings and change orders. Conduct regular meetings to facilitate communication, address challenges and to meet project objectives. Provide regular updates and reports on project status, including milestones, budget updates, and any significant developments or risks. Implement and enforce safety protocols and ensure compliance with local building codes and regulations. Carry out thorough project evaluations and assessments to identify areas for improvement and implement necessary corrective measures. Provide leadership and guidance to the project team, fostering a collaborative and high-performance work environment.
January 2021February 2023
2 years 2 months
Alina group

Astana, www.alina.kz

Chemical Production, Fertilizers... Show more

Project manager "Development of a logistics center for the production of dry mixes with a railway siding in Nur-Sultan"
Project manager "Development of a logistics center for the production of dry mixes with a railway siding in Nur-Sultan" Logistics center with an area of 20,000 m2 located on a plot of S 3 hectare: 1. Development of a feasibility study for the project 2. Development of the project charter 3. Project budget 4. Project implementation schedule 5. Collection of initial permits for design 6. Design 7. Preparatory work for the start of construction and installation works for the reconstruction of existing buildings and the construction of new structures. 8. Conclusion of contracts with suppliers and contractors of the project 9. Quality control and timing of the development of sections of the shop drawings and stages of civil works.
January 2019September 2020
1 year 9 months
FLSmidth

Karaganda, www.flsmidth.com

Industrial Equipment, Machine Tools and Components... Show more

Project manager "Development of service-technical center in Karaganda"
Design and construction of service-technical center in Karaganda. Achievements: In a short time, the entire set of initial permits for design was received. The purpose of the land plot has been changed, the land plot has been transferred from state to private ownership. Completed development of design and estimate documentation, received a positive Conclusion of the State Expertise. A metal frame of 500 tons was erected, beam cranes with a lifting capacity of 51 tons were mounted. Construction and installation work completed, equipment installed.
May 2018December 2018
8 months
BI-Group, ТМ

Khromtau, www.bi-group.kz

Construction, Real Estate, Architecture... Show more

Project manager "Industrial facility in Khromtau, Kazakhstan"
BI-Industrial LLP «Construction of tower-type headgear in Khromtau, Kazakhstan» Accomplishments: Calculated the cost of the project and protected the estimated cost of construction to the customer. Prepared project execution plan. Signed general contract. Successful started construction works.
June 2015January 2018
2 years 8 months

Astana, www.aecom.com

Construction, Real Estate, Architecture... Show more

Technical supervision engineer "Abu Dhabi Plaza Project in Nur-Sultan"
Accomplishments: Ensured the quality of construction work that met all the expectations and requirements of the customer. Responsibilities: - Review all the current Contract information between the Employer and the Contractor, generally get to know this information in order to be able to comment and discuss - To support the Aecom CSC team in managing, reviewing, monitoring and reporting of the AECOM, daily, weekly and monthly activities - Ensuring all legal requirements in terms of Local Authorities Inspections are met - Ensure checking of working drawings to ensure compliance with KZ legislation and Approved Contract Documents - Ensure the Construction Supervision Team are at all times professional and carry out their duties in accordance with AECOM Company policies and Contract Requirements - Taking all the necessary measures to ensure that the works entrusted to the Construction Contractors under his supervision are carried out in strict compliance with: o The site HSE requirements; o Quality requirements, compliance with the Project QA and the AECOM QA Plans (Signing off Inspection acts) o The quality, technical and schedule requirements of the Contractors; o Sound engineering practices o Employer requirements o Supervision and monitoring the team of engineers working with him and Construction contractors o Record and monitor Contractors activities, schedule, performance, planning, logistics o Supervision of contractors’ Quality Control Activities consisting of: - Check all Construction Quality Control Plans issued by Construction Contractors on the basis of Contractor Quality Control Procedures - Together with the QA Manager / Engineering Supervisors, co-ordinate in matters pertaining to Quality Control, inspection and testing - Monitor and audit Construction contractor’s Quality Control activities - Review and track the Inspection acts and Test records - Facilitate issue of Site Inspection Reports, initiate Non-Conformance Reports (NCR) - Ensure checking that corrective actions have been performed - Ensure issue of feedback sheets and monitor permit approvals - Ensure checking of Hidden works - Review, comment, monitor (under the authority of the CS Lead) the method statements issued by Construction contractor - Carry out regular meetings with the Contractor, review and advise on the Construction Techniques and Methodologies - Ensure that all AECOM works are carried out in accordance with the AECOM QA Plan - Ensure that the AECOM teams are working in a collaborative manner and at all times sharing relevant information to each section of the works.
April 2012May 2015
3 years 2 months
ORDA INVEST Corporation

Astana, orda-invest.kz

Construction, Real Estate, Architecture... Show more

Project manager "Residential complexes in Nur-Sultan"
Accomplishments: Successful implementation of the projects. Achievement of all planned indicators. Responsibilities: Project management, a full cycle (Responsibility for content, time-frames, cost, quality of projects) Management of processes group : - Initiating process - Planning process - Implementation process - Monitoring and controlling processes - Completion process 1. The initial permits for the design and construction 2. The task for the design, APL, technical requirements, graphics 3. Collaboration with Design Institute (development of optimal design solutions to the concept, layout of the apartment, form-factors , materials, cost of the project, etc.) 4. Control of turnkey contractor (engineering supervision, designer’s supervision) 5. Forming of the materials for sales (brochures, specifications, layouts cutting) 6. Dealing with government agencies and services for the connection to networks 7. Changes management, risk identification 8. Commissioning of the facilities.
January 2010March 2012
2 years 3 months
BAZIS-A Corporation

Astana

Construction, Real Estate, Architecture... Show more

Engineering Director «Development of Administrative building “ Emerald quarter” block B».
Accomplishments: Successful implementation of the projects. Achievement of all planned indicators. The construction of the facility was completed in 2.5 years Responsibilities of Engineering Director of the: 1. Management process concerning obtaining of permits, licenses, approvals for object construction from SACC (GASK) (state architecture construction control) 2. Development of production works schedule pointing out the appropriate stages. 3. Receiving of drawing design from design team, control and delivery to the construction area. 4. Control and management of the construction process at all stages beginning with timbered excavation and ending with commissioning works: а) Correspondence with the relevant legal bodies б) Chairing and keeping the minutes of site meetings . в) Responsible for decision making of production, technical. organizational problems appeared during construction г) Coordination of relationship between project team, contractors, municipal representatives and Customer . д) Review of contractors’ completion report , field supervision, engineering supervision and other services suppliers . 5. Preparation of technical and operating documentation, checking for conformance with regulatory legal act of the Republic of Kazakhstan, SNiP of the Republic of Kazakhstan (construction codes and regulations of the Republic of Kazakhstan), State standard of the republic of Kazakhstan, drawing design for submission to the state acceptance commission. Object commissioning process management.
May 2007August 2009
2 years 4 months
Zhana Alan LLP

Astana

Construction, Real Estate, Architecture... Show more

Project manager "Mall (Rakhmet) in Nur-Sultan"
Project management, a full cycle (Responsibility for content, time-frames, cost, quality of projects)
August 2006April 2007
9 months
BI-Group, ТМ

Astana, www.bi-group.kz

Construction, Real Estate, Architecture... Show more

Technical supervision engineer "Residential complex (Dostar) in Nur-Sultan"
Responsibilities: - Review all the current Contract information between the Employer and the Contractor, generally get to know this information in order to be able to comment and discuss - To support the managers team in managing, reviewing, monitoring and reporting of the contractor's daily, weekly and monthly activities - Ensure checking of working drawings - Taking all the necessary measures to ensure that the works entrusted to the Construction Contractors under his supervision are carried out in strict compliance with: o The site HSE requirements; o Quality requirements, compliance with the Project QA Plans (Signing off Inspection acts) o The quality, technical and schedule requirements of the Contractors; o Sound engineering practices o Employer requirements o Supervision and monitoring the team of engineers working with him and Construction contractors o Record and monitor Contractors activities, schedule, performance, planning, logistics o Supervision of contractors’ Quality Control Activities consisting of: - Check all Construction Quality Control Plans issued by Construction Contractors on the basis of Contractor Quality Control Procedures - Together with the QA Manager / Engineering Supervisors, co-ordinate in matters pertaining to Quality Control, inspection and testing - Monitor and audit Construction contractor’s Quality Control activities - Review and track the Inspection acts and Test records - Facilitate issue of Site Inspection Reports, initiate Non-Conformance Reports (NCR) - Ensure checking that corrective actions have been performed - Ensure issue of feedback sheets and monitor permit approvals - Ensure checking of Hidden works - Review, comment, monitor (under the authority of the CS Lead) the method statements issued by Construction contractor
August 2001March 2006
4 years 8 months
MOTIV LLP

Astana

Construction, Real Estate, Architecture... Show more

Construction manager, Surveyor, head of surveyor service, site engineer
Construction management

Skills

Skill proficiency levels
Team management
Project management
Advanced user of all necessary computer programms
Construction Management

Driving experience

Own car

Driver's license category B, C

About me

2015 Certified by: "ISO 9001:2015 Quality Management System" "Project management based on the ANSI PMI PMBOK Guide Fifth Edition". MS Project 2010 2016 The status of an expert in expert work and engineering services was assigned with the right to carry out this activity: by type: Examination of urban planning, pre-project and design estimates. specialization: Pre-project documentation Honest, business, hard-working.

Higher education

2001
Higher education
Eurasian University named after L.N. Gumilyov Astana
Civil and industrial construction, ARCHITECTURE AND CIVIL ENGINEERING

Languages

Kazakh — Native

English — C1 — Advanced

Russian — C2 — Proficiency

Citizenship, travel time to work

Citizenship: Kazakhstan

Permission to work: Kazakhstan, Other

Desired travel time to work: Doesn't matter